In this application note, LC separation and MS1 mass identification of a variety of oligos without the use of ion‑pairing reagents is demonstrated. The LC separation allows subsequent positive mode use with little to no flushing or hardware changes. This HILIC-based method uses an Agilent InfintyLab Poroshell 120 HILIC-Z column and MS-friendly ammonium acetate-based mobile phases. The samples were analyzed on an Agilent 1290 Infinity II LC system and a 6545XT AdvanceBio quadrupole time-of-flight mass spectrometer (LC/Q-TOF).
G-CON: The Benefits of G-CON Service Solutions
February 19th 2025Following project close out, the G-CON Service Team will ensure that your PODs continue to function as intended. Service offerings include preventative maintenance plans, spare parts, NEBB certified TAB services (testing, adjusting, and balancing), and expedited support options. Additionally, the Service Team handles all warranty requests and manages data from these activities to drive continuous improvement in our products’ performance across all aspects.
Cleanroom Doors: Tailored Solutions for Seamless Integration and Compliance
February 19th 2025Learn about the customization of cleanroom doors to meet specific operational and design requirements. This paper highlights GCS's ability to tailor door solutions, ensuring seamless integration with existing cleanroom infrastructure while maintaining efficiency, sterility, and compliance with industry standards. With a commitment to quality, compliance, and efficiency, GCS delivers door solutions designed to enhance cleanroom performance and meet the stringent demands of controlled environments.
The Next Generation of Prefabricated Cleanrooms: floorlessPOD
February 19th 2025G-CON’s floorlessPOD is a free-standing structure that provides direct integration with the host facility floor, eliminating the need for ramps, platforms and stairs typically required with prefabricated structures that have integrated floors. With fully integrated MEP, the floorlessPOD is an ideal solution when the cleanroom cannot be structurally supported by the host facility.